Logo Kérwá
 

A fuzzy model for shortage planning under uncertainty due to lack of homogeneity in planned production lots

dc.creatorAlemany Díaz, María del Mar Eva
dc.creatorGrillo Espinoza, Hanzel
dc.creatorOrtiz Bas, Ángel
dc.creatorFuertes Miquel, Vicente Samuel
dc.date.accessioned2026-04-22T20:39:57Z
dc.date.issued2015-01-03
dc.description.abstractLack of homogeneity in the product (LHP) affects several sectors like horticulture, reverse logistics, furniture, ceramics and leathers, among others. Productive processes with LHP are characterized by manufacturing units of the same finished good (FG) with certain attributes that differ and are relevant to customers. This aspect leads to the existence of different subtypes of the same FG in each production lot, which provides homogeneous sublots. Due to inherent LHP uncertainty, the size of each homogeneous sublot is not known until produced. LHP becomes a problem when customers order several units of the same FG and require homogeneity among them; i.e., being served with the same subtype. Like inherent LHP uncertainty, discrepancies between planned homogeneous quantities and the real ones is quite usual. This means it is impossible to serve committed orders with the previously defined requirements of quantity, homogeneity and due date, which brings about a shortage situation. In this paper, a fuzzy mixed integer linear programming model is proposed to support shortage planning in environments with LHP (LHP-FSP model). The LHP-FSP model aims to maximize the profits of served orders by reallocating the quantities of subtypes in stock and the uncertainty future ones in the master plan among the already committed orders. One of the main contributions of the paper is to model the fuzzy interdependent coefficients that represent the fraction of each homogeneous sublot. Finally, experiments based on realistic data from a ceramic company have been designed to validate the model and to analyze its behavior in different scenarios.
dc.description.procedenceUCR::Vicerrectoría de Docencia::Ingeniería::Facultad de Ingeniería::Escuela de Ingeniería Industrial
dc.description.procedenceVicerrectoría de Investigación
dc.description.sponsorshipSpanish Ministry of Economy and Competitiveness/[Ref. DPI2011-23597]//España
dc.description.sponsorshipUniversitat Politècnica de València/[Ref. PAID-06-11/1840 Methods and models for operations planning and order management in supply chains characterized by uncertainty in production due to the lack of product uniformity (PLANGES-FHP)]//España
dc.identifier.doihttps://doi.org/10.1016/j.apm.2014.12.057
dc.identifier.urihttps://hdl.handle.net/10669/104236
dc.language.isoeng
dc.rightsacceso abierto
dc.sourceApplied Mathematical Modelling, 39(15), 2015
dc.subjectMathematical programming model
dc.subjectShortage planning
dc.subjectOrder promising
dc.subjectLack of homogeneity in the product
dc.titleA fuzzy model for shortage planning under uncertainty due to lack of homogeneity in planned production lots
dc.typeartículo original

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
1-s2.0-S0307904X1400732X-main.pdf
Size:
844.71 KB
Format:
Adobe Portable Document Format

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
3.5 KB
Format:
Item-specific license agreed upon to submission
Description: