Browsing Arquitectura by Title
Now showing items 239-258 of 386
-
Model reference pi controller tuning for second order inverse response and dead time processesand science
(2016-09-06)In this paper, a One-Degree-of-Freedom PI controller is optimized using the model reference tuning approach for a Second Order Inverse Response and Dead Time Process operating as a servo control. In addition, a graphic ... -
Monitoring the moin beach to control morphological changes due the construction of the moin container terminal, Limon
(2016-05-10)The Moin Container Terminal (MCT) is a project under construction that represents one of the largest investments in Latin American port facilities. The first stage consists of a seven million cubic meter sand fill constructed ...